Originally Posted by
Nexus Flux
Looking at the specs for the Coulomb Technologies CT500 charging station (240V), it draws 7.5 kW of power.
Hypothetically speaking, let's see what this works out to.
Assuming it takes 4 hours for a full charge, that's 30 kW. Assuming the owner charges it nightly, that's 10950 kW per year. At 12.5 cents per 1 kW, that works out to $1368.75 per year.
For the same cost, one could buy 463.98 gallons of premuim at $2.95 per gallon. That works out to just a little over 42 tanks of gas for my car. Seeing how I go through about a tank of gas a week, that's about 42 weeks worth of gas. The Volt seems to have an edge up on the old RSX. But then again, I could buy cheaper gas, drive nicer, and use the highway (I drive 95% city). Also that assumes the Volt buys no gas throught the year, thereby capping it at 14600 miles per year max.