Results 1 to 3 of 3

Thread: 1/2 finished

  1. #1

    Default 1/2 finished

    Well, we got the front upper and lower control arm bushings replaced and the new struts, bump stops, and nb tophats installed on the front. Now we just need to do the back. Bushings weren't as hard as I was led to believe, just time consuming.

    Just a little 'rake' at the moment.




    plus side is, even before an alignment 90% of my 65mph shimmy has disappeared....
    [SIGPIC][/SIGPIC]

  2. #2
    Driver creek's Avatar
    Join Date
    Apr 2008
    Location
    Dallas, TX
    Posts
    983
    Blog Entries
    4

    Default

    Congrats, the backs will probably cure the rest.
    Stripe Das Sape

    We are leading the world to democracy by example.

  3. #3

    Default

    hopefully. if not, the outer tie rods look to be worn, that may be another part of the issue. Hope to do the back end saturday night.... we are starting around 8:30.... i have a feeling i won't be sleeping much, lol
    [SIGPIC][/SIGPIC]

Similar Threads

  1. Rogue finished BR's car?
    By Sharpie in forum Bull
    Replies: 12
    Last Post: 12-02-2009, 03:40 PM
  2. Just about finished
    By BoostedNB in forum FI Miata Tech & Chat
    Replies: 12
    Last Post: 10-30-2007, 09:50 PM
  3. Just finished putting a PWR radiator in.
    By HudsonHawk in forum Miata Tech and Chat
    Replies: 5
    Last Post: 04-30-2007, 05:47 AM
  4. Just finished repainting the Miata
    By Screamin'Screw in forum Miata Tech and Chat
    Replies: 12
    Last Post: 11-20-2005, 03:19 AM
  5. Well, two of the Worst Fnnn tires in the world finished
    By Screamin'Screw in forum Miata Tech and Chat
    Replies: 0
    Last Post: 01-21-2005, 11:37 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •