House is off the market...back to work :(
August 1 was four months and not one offer. July only had two showings. I have been very unhappy with my realtor, as she promised all the things I desired but did not follow thru. OK, so the house is a bit unusual, and being only 2-bedrooms didn't help.....
Sooo, I'm going back to work on the dang thing. Upstairs will be configured back to two bedrooms, each with it's own bathroom. Downstairs guest bedroom will revert back to the master bedroom with the 8x8 bathroom becoming a walk-in closet and a 13x11 addition will be a new bathroom, with room to move the whirlpool tub downstairs and move the vanity, toilet, and shower from the original bathroom, with some updrades. Exterior will be an exact match to the rest of the house with super white stucco walls, red metal roof, and a round glass-block window to continue that theme.
Demolition will begin this Saturday and I expect a 6-8 week completion time. Wish me better luck this time......